At Triform, we work with a variety of clients and end users. We understand that each project is unique and approach each new opportunity with the goal of providing innovative, solution-based service as needed for each individual client.

Green Treen Library Skylight

Harrell Headquarters - Jurupa Valley
Government/Public Works

New interior framing and drywall for Jurupa Community Services District Maintenance and Administration Buildings. The 24,040 SF space was completed in nine months. Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • Thermal Insulation

  • Bullet-resistant partitions

  • Interior drywall to include fire rated and acoustical systems

  • Interior tape and finish level 5

  • Installation of hollow metal door frames

​

Green Tree Library Addition & Renovation – Victorville
Government/Public Works

New interior and exterior framing, drywall, and sheathing for the City of Victorville’s new library. The 26,989 SF space was completed in ten months. Our scope included:

  • Interior and exterior light gauge framing of partitions and ceilings

  • Thermal Insulation

  • Exterior sheathing

  • Interior drywall to include fire rated and acoustical systems

  • Interior tape and finish level 4

  • Installation of hollow metal door frames

​

SchoolsFirst Federal Credit Union - Lancaster
Retail

New interior framing and drywall for a ground-up bank. The 6,200 SF space was completed in three months. Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • Thermal Insulation

  • Bullet-resistant partitions

  • Interior drywall to include fire rated and acoustical systems

  • Interior tape and finish level 5

  • Installation of hollow metal door frames

​

Rasouli Spinal Surgery Center
Healthcare

New interior framing and drywall for a spinal surgery center in Beverly Hills. The center is 12,818 SF and was completed in three months. Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • X-ray protection and radiation shielding

  • Interior drywall to include fire rated and acoustical systems

  • Interior tape and finish level 5

  • Installation of hollow metal door frames

​

Nassiri-Beacon Center Ambulatory Surgical Center
Healthcare

New Interior framing and drywall for an ambulatory surgery center in Beverly Hills. The surgery center is designed to provide surgical procedures not requiring an overnight hospital stay. The center is 14,516 SF and was completed in four months. Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • X-ray protection and radiation shielding

  • Interior drywall to include fire rated and acoustical systems

  • Interior tape and finish level 5

  • Installation of hollow metal door frames

Compassionate Care
Healthcare

Framing and drywall for a cancer treatment facility in Laguna Hills. The project was a tenant improvement in an existing and operating medical building. The project was 14,822 SF and was completed in two months. 

Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • X-ray protection and radiation shielding

  • Interior drywall to include fire rated and acoustical systems

  • Insulation

  • Interior tape and finish level 5

  • Installation of hollow metal door frames

  • Infection Control

Converse Citadel Outlet
Retail

Interior framing and drywall for a tenant improvement buildout in Commerce, CA. The project was 4,182 SF and completed in three months.

Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • Interior drywall to include fire rated and acoustical systems

  • Insulation

  • Interior tape and finish level 4

  • Installation of hollow metal door frames

  • Casework and display installation

Solidcore Hollywood & Culver City
Retail

Interior framing and drywall for two new Pilates studios in Hollywood and Culver City. Both projects are roughly 2,000 SF and were completed in three months. Our scope included:

  • Interior light gauge framing of partitions and ceilings

  • Interior drywall to include fire rated and acoustical systems

  • Interior tape and finish level 4

  • Installation of hollow metal door frames

  • Top of wall spring isolators for shear loading (Hollywood location)